Kouk Khleang Youth Center

Consturction of Youth Center

At Phnom Penh, Cambodia in Cambodia
From 2010 to 2014
By Ukumbi - Finland

The youth center was designed and built as a collaboration between Komitu architects team and two Cambodian NGOs Cambodian Volunteers for Society (CVS) and Khmer Kamputchea Krom for Human Rights and Development Association (KKKHRDA) in a disadvantaged urban neighbourhood of Phnom Penh, Cambodia. CVS provides Cambodian youth with opportunities to learn, get work experience and unlock their potentials in order to do their share in the development of Cambodian society. Volunteering youth make useful contributions to their communities while gaining work experience for their future professional careers. Through CVS, youth from different urban communities meet and find solutions for common problems. KKKHRDA manages the neighbourhood where the center will be built and airs a radio program about human rights.
The bases of Komitu’s work is on culturally sensitive and participatory design. During the design process the voice of the youth was heard through workshops. The building phase also engaged the locals. The design of the youth center is based on the use of local and sustainable building materials and technologies. Earth bricks are a low-emission choice for the bearing structures, while bamboo has been chosen for shadings and decoration because it is rapidly renewable, affordable and traditionally used in Cambodian culture. By developing modern architecture that derives from local esthetics and craftsmanship we can promote the use of these undervalued materials in modern day Cambodia.
The project started in march 2010 on Aalto University’s Cambodia Studio’s field trip, where Komitu members Elina Tenho and Tuuli Kassi organised the first workshops with the youth volunteering for CVS. In December 2010 we travelled back to Phnom Penh to introduce the first design for the youth center and to futher develop it together with the future users. In addition to the design workshop with the local youth, presentations were held at Limkokwing University for students of architecture and at Meta-house culture center for anyone interested.
During the year 2011 Komitu worked on the design and developed the bamboo and earth brick techniques together with engineering collaborators. In March 2012 the construction begun with filling the site and prefabricating bamboo parts. In August 2012 we had a change of constructor, after which the building advanced at a good pace and BQC construction

building scheme
youth centre
shutters detail
the entrance

Technical support for earthquake affected households in Nepal

To provide social and technical support for approximately 600 households, in 3 earthquake affected Districts of Nepal - Dolakha, Dhading and Rasuwa

At Nepal
By Architecture Sans Frontières - Nepal
Local partners: Pourakhi Nepal
Donors: Caritas Luxembourg

The main objective of this project was to improve housing conditions in earthquake affected communities in selected wards of Dolakha, Rasuwa and Dhading districts through five aspects:
1.    Social Mobilization
2.    Technical Assistance
3.    Tiered Assistance
4.    Market Development
5.    Local building culture

We started the project in June with household survey along with community mapping. The survey was done to assess the need and status of the reconstruction of the target beneficiaries with their understanding of local building culture.
Demo house was constructed to promote local building culture and to train the local builders and masons to build earthquake resistant houses following government standards and codes.  The completion of demo house served as an exemplar for the community to start reconstruction of their houses following local building culture and government standards. This further paved the way for them to become eligible for the government grant. Under this project, our team on site supported these beneficiaries in this process by providing regular technical support, house drawings and required information. In addition, we short listed most vulnerable beneficiaries to provide them with top up grant to assist in the reconstruction process.
Furthermore, we also provided vocational training like Kiwi, cardamon plantation, hospitality and plumbing training to the selected locals to enhance their skill and livelihood.
We provided all of our beneficiaries with required technical assistance to complete the reconstruction of their houses till the completion of the project period in June 2019. Till then, almost all the targeted beneficiaries had either completed or were constructing their houses and nearing completion.

earthquakes_nepal_cardamon
Training at the cardamon plantation
earthquakes_nepal_house
Completed house
earthquakes_nepal_house 2
Demo house house
earthquakes_nepal_house 3
Demo house under construction
earthquakes_nepal_house 4
House in Dolakha under construction
earthquakes_nepal_house 5
Applying mud plaster to the demo house
earthquakes_nepal_areal
Magapauwa

Building the Guambian Community

Social development and settlement improval

At MORALES in Colombia
In 2007
By Architetti Senza Frontiere Italia
Local partners: Fundacion Horizonte of the socialgroup Asmet Salud

The project has the purpose of contributing to the reinforcement of the social, ethnic and cultural background of the “Guambian” native community of the “Cabildo La Bonanza” by means of the improvement of its habitat, that is to say the living, hygienic, sanitary conditions and infrastructures. Beneficiaries are composed of 205 Guambian families coming from Resguardo of Guambia Silvia and compelled, since 1930, to move into the east part of Morales Municipality for the lack of lands to live on. The Community faced the difficulties coming from settling in a new land, with the risk of loosing its own identity as a native ancestral community.

Gambian Community asked for support in the reinforcement and improvement of its settlement, as well as in the process of social and cultural development. According to this request, ASF Onlus elaborated the following project in cooperation with the local community:
a) improvement of the present hygienic, sanitary, living conditions and infrastructure, necessary to guarantee the available habitat for the community. For this purpose, the project will provide to the building of 20 houses for 20 families together with the basic infrastructures linked to them, in status of “auto-costruzione”;
b) creation of a laboratory for the manufacturing of “guadua” (a kind of material similar to bamboo) and of wood, useful for the houses’ construction;
c) promotion of training activities in communitary organization, leadership, building activities, manufacturing, creation of small factories, with the aim of strengthening the communitary organization and starting up productive activities in favour of the whole community.

The project aims to make all the people involved (target group and local partners) able to develop their own technical and organization abilities by means of a communitary, synergic partecipation between the whole native population and the target group. Thus the project aims to contribute in making it easier to begin a sustainable development process.

location
housing
wooden construction

Housing units for the personnel of Masanga hospital in Sierra Leone

Support a renovated hospital with staff housing

At Sierra Leone
By Arkitekter Uden Grænser - Denmark
Local partners: Danish NGO with local branch in Sierra Leone
Donors: Café Retro and Statens Kunstfond

„Several new housing units for the staff at Masanga Hospital in Sierra Leone. The hospital will thus have an easier time recruiting qualified staff. Today the hospital is functioning well and around 150 patients are treated every day. One of the biggest issues, that they are facing, is the lack of decent staff housing. Without decent housing the staff is left to live in primitive huts and attracting qualified staff is difficult.
DEVELOPMENT TARGETS:
- That Masanga Hospital can attract qualified labour by offering decent accommodation.
- That the hospital, through more and better trained staff, can increase its capacity and provide better service to people living within its catchment area.
ARCHITECTURE:
The project contains several new housing units for the staff of the Masanga Hospital. The specific units is a part of a bigger whole, which gradually can develop and be used by locals as a standard model for developing their village. The units have a longer lifespan and offers a better indoor climate for a lower cost. The country is going to operate the hospital by 2016 and the ambition is to construct 250 staff housing units by then. An important aspect is to secure local ownership by including the community in the construction, so they can take over the future constructions.
It has been of high focus to develop housing that took climate, functionality and local materials into consideration. The intention has also been to integrate parameters such as natural ventilation, daylight and cooling. Because of a very limited financial frame low cost solutions have also been of high priority. Each unit is to be inhabited by a family or three nurses.
PROJECT TEAM: Rasmus C. Hamann, Camilla Kragh, Silje Erøy Sollien

Masanga_dwellings2
Housing units for the hospital's personnel, type 1
Masanga_dwellings3
Housing units for the hospital's personnel, type 2